ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 248 of 620
Metering and Regulating station at Nea Messimvria
TRA-N-941 Update Date
Project
Pipeline including CS
Non-FID
Non-Advanced
04/07/2016
The project consists of the implementation of one Metering & Regulating station at Nea Messimvria for the interconnection of the Greek transmission system with TAP.
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point
Operator DESFA S.A.
Year 2019
From Gas System To Gas System Capacity
Nea Mesimvria
142.0 GWh/d
GR/TAP
GR
Sponsors
General Information
Promoter Operator
DESFA S.A. DESFA S.A.
Host Country
Greece
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (Development Plan NNGS 2015-2024)
Regulated Regulated
2.2.1.3
05/2016
03/2018
Not Relevant Not Relevant
Currently PCI
Market Test Permitting Supply Contracts FID Construction Commissioning
Exemption Granted
Yes (7.1.6)
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
No
0.00% 0.00%
Not Relevant (no CBCA decision)
2019
2019
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
95
Made with FlippingBook - Online catalogs