ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 234 of 620
Revythoussa (2nd upgrade)
LNG-F-147 Update Date
Project
LNG Terminal
FID
Advanced
04/07/2016
The projects consists of: - the upgrading of the send-out capacity from 1000 to 1400 m3/h (from 14,14 to 19,82 Nm3/d) - the upgrading of the storage capacity from 130.000 m3 to 225.000 m3 with the addition of a 3rd tank - the increase of maximum ship size from 140.000 to 260.000 m3
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point
Operator DESFA S.A.
Year 2017
From Gas System To Gas System Capacity
Agia Triada
80.4 GWh/d
LNG_Tk_GR
GR
Sponsors DESFA
General Information
100%
Promoter Operator
DESFA S.A. DESFA S.A.
Host Country
Greece
Status
Under Construction
Website
Project's URL
Publication Approval Status
Approved
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (Development Plan NNGS 2015-2024)
Regulated Regulated
2.2.1.5
No
Currently PCI
Exemption Granted
No
Not Relevant
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
No
0.00% 0.00%
Not Relevant (no CBCA decision)
12/2017
2017
2017
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM