ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 279 of 620
Comment: Minimum on-shore LNG terminal size based on the most appropriate capacity booked through the Open Season 1×150.000m3storagetank Utilization of jetty used also for the FSRU terminal
Croatia LNG
COD - 2021-2023 (depending on duration of FSRU charter contract)
Capacity Increments Variant(s) For Information Only Variant : 4. - Onshore LNG terminal
4th phase - LNG onshore terminal with annual send-out capacity of 8.75 bcm/y
Point
Operator
Year 2024
From Gas System To Gas System Capacity
100.0 GWh/d
LNG Hrvatska d.o.o.
LNG_Tk_HR
HR
Comment: If market demands, expand (with minimum investment in re-gasificators) the LNG terminal send-out
Croatia LNG
COD - 2024+
Capacity Increments Variant(s) For Information Only Variant : 3. - Onshore LNG terminal
3rd phase - LNG onshore terminal with annual send-out capacity of 5 bcm/y
Point
Operator
Year 2023
From Gas System To Gas System Capacity
40.0 GWh/d
LNG Hrvatska d.o.o.
LNG_Tk_HR
HR
Comment: In case that the limited volume risk condition is reached, expansion
Croatia LNG
Introduction of the second tank to allow peak management
COD - 2021/2023 (depending on duration of FSRU charter contract)
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
88
Made with FlippingBook - Online catalogs