ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 278 of 620

LNG terminal Krk

LNG-N-082 Update Date

Project

LNG Terminal

Non-FID Advanced

23/05/2016

The import terminal for the liquefied natural gas (LNG) will be situated in Omišalj on the Island of Krk, Republic of Croatia. The project is planned as a stage development: with: 1st stage - FSRU with annual send-out capacity of 1- 4 bcm/y (according to FSRU ship and pipeline availability), 2nd stage - LNG onshore terminal with annual send-out capacity of 3.5 bcm/y, 3rd stage - LNG onshore terminal with annual send-out capacity of 5 bcm/y and 4th stage - LNG onshore terminal with annual send-out capacity of 8.75 bcm/y. Construction and the size of the onshore terminal will depend on the market need. Future LNG Terminal will be an important part for the security of supply for Central and South-Eastern European countries. Gas supply in the region is heavily dependent on one supply source and therefore LNG terminal in Croatia would represent a major diversification gas supply route in the region. Croatian Energy Regulatory Agency has given to LNG Croatia LLC on 03.02.2016, a permit for performing energy activities which enables LNG Croatia LLC to operate the terminal.

Description

Regulatory Decisions and similar material conditions

Capacity Increments Variant For Modelling Variant : 1. - FSRU

1st phase - FSRU with annual send-out capacity of 1- 4 bcm/y (according to FSRU ship and pipeline availability)

Point

Operator

Year 2018

From Gas System To Gas System Capacity

107.0 GWh/d

LNG Hrvatska d.o.o.

LNG_Tk_HR

HR

Comment: Short-term rented FSRU (min 3, max 5 years)

Commissioning (COD) year - 2018 (Challenging pipeline availability)

Croatia LNG

Send-out - 1-4 bcm/y (According to FSRU ship and pipeline availability)

Capacity Increments Variant(s) For Information Only Variant : 2. - Onshore LNG terminal

2nd phase - LNG onshore terminal with annual send-out capacity of 3.5 bcm/y

Point

Operator

Year 2021

From Gas System To Gas System Capacity

Croatia LNG

-13.0 GWh/d

LNG Hrvatska d.o.o.

LNG_Tk_HR

HR

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B |

87