ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 298 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test Permitting Supply Contracts FID Construction Commissioning
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (2017-2026)
Regulated Regulated
1.34
No No
Currently PCI
Exemption Granted
No
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
No
70.00% 30.00%
Not Relevant (no CBCA decision)
04/2026
11/2026
2026
2026
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment Croatian part is 8 km
Diameter (mm) Length (km) Compressor Power (MW)
Umag - Plovanija (HR)- Koper (SI)
300
8 8
Total
Expected Gas Sourcing
LNG (HR), Croatian gas transmission system
Benefits
Main Driver
Market Demand
Main Driver Explanation Benefit Description
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Southern Corridor GRIP 2017–2026 Annex B |
86