ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 293 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test Permitting
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (2017-2026) 1.32 and 1.33
Regulated Regulated
No No
Currently PCI
Exemption Granted
No
12/2012
09/2026
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
Supply Contracts FID
No
70.00% 30.00%
Not Relevant (no CBCA decision)
12/2024 11/2026
Construction
04/2025
Commissioning
2026
2026
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Lička Jesenica-Rakovica
500 500
20 10 30
Rakovica-Bihać
Total
Expected Gas Sourcing Caspian Region, LNG (HR,QA), it can be gas from Croatian transport system, Croatian UGS and all import routes
Benefits
Main Driver Market Demand Main Driver Explanation For the western part of Bosnia and Herzegovina
The aim of the project is to assess the feasibility of providing gas supply to the Una-Sana Canton in BiH from the Croatian gas transmission system. It will be from the Lička Jesenica gas transmission node in Croatia via Lika to the HR/BiH border and from there to Bosanska Krupa with brances to Bihać and velika Kladuša in Una-Sana Canton. The extension of the gas transmission in Croatia to the border with BiH will allow additional gasification in the part of Croatia along the pipeline route. Barriers
Benefit Description
Barrier Type
Description
Market
Lack of market support
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM