ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 7 of 620

NDP and PCI Information

Schedule

Start Date

End Date

Third-Party Access Regime

Part of NDP NDP Number

Pre-Feasibility Feasibility FEED Market Test Permitting

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (NDP 2016 - 2025)

Regulated Regulated

GCA 2015/05

Yes Yes

Currently PCI

Exemption Granted

Yes (6.24.3)

10/2015

07/2017

CBCA Decision Market Survey

Exemption in entry direction Exemption in exit direction

No

Supply Contracts FID Construction Commissioning

0.00% 0.00%

Not Relevant (no CBCA decision)

10/2020

2020

2020

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

The technical load factor of the pipeline is confidential and must not be published in the TYNDP. Total

Mosonmagyarovar

PCI Details

PCI Benefits General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Benefits

Main Driver Market Demand Main Driver Explanation Pipeline projects are planned according to market demand. Current planning is based on market indications. Benefit Description

Strenthening the establishment of a potential Southern Corridor and contribution to a diversification of sources e.g. Black Sea Gas.

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B | 9