LNG Evacuation Pipeline Kozarac-Slobodnica
TRA-N-1058 Update Date
Project
Pipeline including CS
Non-FID
Non-Advanced
13/07/2016
Gas pipeline Kozarac - Slobodnica jointly with gas pipeline sytem Zlobin - Bosiljevo - Sisak-Kozarac and with gas pipeline Omišalj-Zlobin makes LNG Main Evacuation Pipeline connecting LNG from the LNG solution on the island of Krk with Central Eastern European counties. The pipeline system is a continuation of the existing Hungary – Croatia interconnection (gas pipeline Varosföld-Dravaszerdahely-Donji Miholjac-Slobodnica) will be connected to the future Ionian Adriatic Pipeline (IAP) will be connected to the future LNG solution in Omišalj It will be the "backbone" of the Croatian gas system.
Description
Regulatory Decisions and similar material conditions
Capacity Increments Variant For Modelling Point
Operator
Year 2023 2023 2023
From Gas System To Gas System Capacity
Croatia LNG
109.9 GWh/d 58.8 GWh/d 56.6 GWh/d
Plinacro Ltd Plinacro Ltd Plinacro Ltd
LNG_Tk_HR
HR HU HR
HR HU
Dravaszerdahely
Sponsors Plinacro
General Information
100%
Promoter Operator
Plinacro Ltd Plinacro Ltd
Host Country
Croatia Planned
Status
Website
Project's URL
Publication Approval Status
Approved
Enabled Projects
Project Code Project Name TRA-N-075 LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac TRA-N-90 LNG evacuation pipeline Omišalj - Zlobin (Croatia) TRA-N-1057 Compressor stations 2 and 3 at the Croatian gas tranmission system
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM