ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 300 of 620
TRA-F-86 Interconnection Croatia/Slovenia (Lučko - Zabok - Rogatec) TRA-F-334 Compressor station 1 at the Croatian gas transmission system Schedule NDP and PCI Information
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test Permitting
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (2017-2026)
Not Applicable Not Applicable Not Relevant Not Relevant
5.2 and 5.3
Currently PCI
Exemption Granted
Yes (6.26.3)
01/2017
01/2020
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
No
Supply Contracts FID
0.00% 0.00%
Not Relevant (no CBCA decision)
01/2018 01/2020
Construction
01/2018
Commissioning
2020
2020
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Time Schedule
Grant Obtention Date Delay Since Last TYNDP Delay Explanation
25/04/2016
Benefits
Main Driver Market Demand Main Driver Explanation Projects will enable the reverse flow in all interconnection point
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM