ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 299 of 620
Compressor stations 2 and 3 at the Croatian gas tranmission system
TRA-N-1057 Update Date
Project
Pipeline including CS
Non-FID
Non-Advanced
14/07/2016
Construction of such facilities is necessary due to the opening of the gas market, as well as providing sufficient transmission capacities and natural gas delivery pressure conditions and for development of the gas market in Croatia and the neighbouring countries. Compressor stations will significantly increase efficiency of the Croatian gas transmission system. Compressor stations are integral part of the transmission system, integrated in the system, primarily in a manner to increase the flexibility of managing the existing transmission capacities of the system, and to provide rational increase of transmission capacities according to user needs, that is, the requirements of the market and to satisfy market conditions arising from the application of new legal regulation.
Description
Regulatory Decisions and similar material conditions
Capacity Increments Variant For Modelling Point
Operator
Year 2020 2020 2020
From Gas System To Gas System Capacity
Croatia LNG
43.3 GWh/d 43.3 GWh/d 62.5 GWh/d
Plinacro Ltd Plinacro Ltd Plinacro Ltd
LNG_Tk_HR
HR HU HR
HR HU
Dravaszerdahely
Sponsors Plinacro
General Information
100%
Promoter Operator
Plinacro Ltd Plinacro Ltd
Host Country
Croatia Planned
Status
Website
Project's URL
Publication Approval Status
Approved
Enabled Projects
Project Code Project Name TRA-N-066 Interconnection Croatia -Bosnia and Herzegovina (Slobodnica- Bosanski Brod) TRA-N-070 Interconnection Croatia/Serbia (Slobdnica-Sotin-Bačko Novo Selo) TRA-N-075 LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM