Ionian Adriatic Pipeline
TRA-N-068 Update Date
Project
Pipeline including CS
Non-FID Advanced
14/07/2016
The pipeline will cross the territory along the Adriatic coast from Fieri in Albania via Montenegro to Split in Croatia and will be linked to the existing Croatian gas transmission system (main direction Bosiljevo – Split). The Ionian-Adriatic Pipeline is considered a part of the Energy Community Gas Ring, which is the concept of gasification for the entire region. IAP is the most important gas project in the Southeastern Europe supported by the Energy Community. The IAP project is based on the idea of connecting the existing Croatian gas transmission system, via Montenegro and Albania, with the TAP gas pipeline system (Trans Adriatic Pipeline) an exit Bosnia and Herzegovina is planned. Plinacro is the project promoter for submitting the project to TYNDP. In addition, Montenegrin and Albanian counterparts sent their approval.
Description
Regulatory Decisions and similar material conditions Capacity Increments Variant For Modelling Point
Operator
Year 2023 2023 2022 2023
From Gas System To Gas System Capacity
Ionic-Adriatic Pipeline - IAP / AB Ionic-Adriatic Pipeline - IAP / ME
33.3 GWh/d 16.6 GWh/d 83.2 GWh/d 83.2 GWh/d
Plinacro Ltd Plinacro Ltd Plinacro Ltd Plinacro Ltd
HR/IAP HR/IAP
AL
ME
HR
HR/IAP
HR/IAP
HR
Ionic-Adriatic Pipeline - IAP / Split - HR
Comment: IT is Exit Croatia
166.5 GWh/d
Plinacro Ltd
2023
IB-HRi/IAP
HR/IAP
Ionic-Adriatic Pipeline - IAP Entry
Comment: The Entry point is from TAP in Fieri
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM