ENTSOG GRIP SC 2017-2026 / Annex B - Project Information
Current TYNDP : TYNDP 2017 - Annex A
Page 290 of 620
NDP and PCI Information
Schedule
Start Date
End Date 09/2013
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test Permitting
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (2017-2026)
Regulated Regulated
1.3
No No
Currently PCI
Exemption Granted
No
08/2014
01/2021
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
Supply Contracts FID
No
70.00% 30.00%
Not Relevant (no CBCA decision)
01/2019 01/2021
Construction
01/2020
Commissioning
2021
2021
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Zagvozd-Imotski-Posušje
500
22 22
Total
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Expected Gas Sourcing
Caspian Region, LNG (), Baumgarten via Slovenia and Croatia
Benefits
Main Driver Market Demand Main Driver Explanation Market Demand and SoS for the Southern part of Bosnia and Herzegovina Benefit Description
The aim of the project is to establish a new supply route for B&H providing a diversified and reliable natural gas supply.
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM