ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 276 of 620

NDP and PCI Information

Schedule

Start Date

End Date

Third-Party Access Regime

Part of NDP NDP Number

Pre-Feasibility Feasibility FEED Market Test

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (2017-2026) 1.18, 1.19, 1.20

Regulated Regulated

09/2015

10/2016

No No

Currently PCI

Exemption Granted

Yes (6.5.2.)

08/2016 01/2020

Permitting

07/2009

CBCA Decision Market Survey

Exemption in entry direction Exemption in exit direction

Supply Contracts FID

No

70.00% 30.00%

Not Relevant (no CBCA decision)

01/2017 01/2020

Construction

01/2017

Commissioning

2020

2020

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Bosiljevo - Sisak Kozarac - Sisak Zlobin - Bosiljevo

1,000 1,000 1,000

102

20 58

Total

180

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Market Integration, Security of Supply, Sustainability

Project will connect several, in the future exceptionally important, points of the Croatian gas transmission system. It is the future strategic gas transmission connector of great significance and is an integral part of the North – South European Corridor named as the North-South (Baltic – Adriatic) Gas Connection. Its purpose is linking the Polish and the Croatian LNG (Liquefied Natural Gas) solutions. This gas pipeline (as well as all the pipelines to which it connects and the associated gas nodes) will provide gas transmission in all directions, i.e. it will satisfy all transmission requirements and will maximise the value of the IAP and LNG projects in Croatia and the region. In addition, it will increase the use of the existing system and the new interconnection with Hungary.

Specific Criteria Fulfilled Comments

Time Schedule

Grant Obtention Date

24/11/2015

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B |

64

Made with FlippingBook - Online catalogs