LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac
TRA-N-075 Update Date
Project
Pipeline including CS
Non-FID Advanced
13/07/2016
Gas pipeline Zlobin - Bosiljevo - Sisak – Kozarac jointly with gas pipeline Omišalj-Zlobin and gas pipeline Kozarac-Slobodnica makes LNG Main Evacuation Pipeline connecting LNG from the LNG solution on the island of Krk with Central Eastern European counties. The pipeline is a continuation of the existing Hungary – Croatia interconnection (gas pipeline Varosföld-Dravaszerdahely-Donji Miholjac-Slobodnica) will be connected to the future Ionian Adriatic Pipeline (IAP) will be connected to the future LNG solution in Omišalj It will be the "backbone" of the Croatian gas system.
Description
Regulatory Decisions and similar material conditions
Capacity Increments Variant For Modelling Point
Operator
Year 2020 2020
From Gas System To Gas System Capacity
Croatia LNG
50.0 GWh/d 50.0 GWh/d
Plinacro Ltd Plinacro Ltd
LNG_Tk_HR
HR HU
Dravaszerdahely
HR
Sponsors Plinacro
General Information
100%
Promoter Operator
Plinacro Ltd Plinacro Ltd
Host Country
Croatia Planned
Status
Website
Project's URL
Publication Approval Status
Approved
Enabled Projects
Project Code Project Name TRA-N-1058 LNG Evacuation Pipeline Kozarac-Slobodnica TRA-N-90 LNG evacuation pipeline Omišalj - Zlobin (Croatia)