ENTSOG GRIP SC 2017-2026 / Annex B - Project Information

Current TYNDP : TYNDP 2017 - Annex A

Page 266 of 620

NDP and PCI Information

Schedule

Start Date

End Date

Third-Party Access Regime

Part of NDP NDP Number

Pre-Feasibility Feasibility FEED Market Test

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (2017-2026)

Regulated Regulated

1.13

No No

Currently PCI

Exemption Granted

No

08/2016 01/2019

Permitting

01/2011

CBCA Decision Market Survey

Exemption in entry direction Exemption in exit direction

No

Supply Contracts FID

70.00% 30.00%

Not Relevant (no CBCA decision)

12/2017 01/2019

Construction

01/2018

Commissioning

2019

2019

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment 4 million m3 daily

Diameter (mm) Length (km) Compressor Power (MW)

Slobodnica - Bosanski Brod

700

6 6

Total

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

No

Competition, Market Integration, Security of Supply, Sustainability Specific Criteria Fulfilled Comments The project is fullffilling and the folloving criteria: Lifting isolation for Bosnia and Herzegovina, reducing bottelnecks, will improve remaining flexibility, will enable source and route diversification

Time Schedule

Grant Obtention Date Delay Since Last TYNDP

The start of the construction has been postponed until 2020. It depends on the agreement with Republika Srpska (B&H)

Delay Explanation

Expected Gas Sourcing LNG (HR), It will be gas from Croatia transport system, Croatian UGS and Croatian planned LNG terminaland Baumgarten via Slovenia

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Southern Corridor GRIP 2017–2026 Annex B | 61

Made with FlippingBook - Online catalogs