LNG evacuation pipeline Omišalj - Zlobin (Croatia)
TRA-N-90 Update Date
Project
Pipeline including CS
Non-FID Advanced
13/07/2016
The pipeline is the connection of the LNG on the Krk island with the Croatian gas transmission system. Gas pipeline Omišalj-Zlobin jointly with gas pipeline system Zlobin - Bosiljevo - Sisak-Kozarac and with gas pipeline Kozarac-Slobodnica makes LNG Main Evacuation Pipeline connecting LNG from the LNG solution on the island of Krk with Central Eastern European counties. The pipeline is a continuation of the existing Hungary – Croatia interconnection (gas pipeline Varosföld-Dravaszerdahely-Donji Miholjac-Slobodnica) will be connected to the future Ionian Adriatic Pipeline (IAP) will be connected to the future LNG solution in Omišalj It will be the "backbone" of the Croatian gas system.
Description
Regulatory Decisions and similar material conditions
Capacity Increments Variant For Modelling Point
Operator
Year 2018 2018
From Gas System To Gas System Capacity
Croatia LNG
52.2 GWh/d 52.2 GWh/d
Plinacro Ltd Plinacro Ltd
LNG_Tk_HR
HR HU
HR
Dravaszerdahely
Comment: It is necessary to use and CS1
Sponsors Plinacro
General Information
100%
Promoter Operator
Plinacro Ltd Plinacro Ltd
Host Country
Croatia Planned
Status
Website
Project's URL
Publication Approval Status
Approved
Enabled Projects
Project Code Project Name TRA-N-1058 LNG Evacuation Pipeline Kozarac-Slobodnica TRA-N-075 LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM