NDP and PCI Information

Schedule

Start Date

End Date

Third-Party Access Regime

Part of NDP NDP Number

Pre-Feasibility Feasibility FEED Market Test

Considered TPA Regime Considered Tariff Regime Applied for Exemption

Yes (2017-2026)

Regulated Regulated

1.24, 1.25

09/2014

12/2014

No No

Currently PCI

Exemption Granted

Yes (6.26.1)

06/2015 01/2019

Permitting

10/2015

CBCA Decision Market Survey

Exemption in entry direction Exemption in exit direction

Supply Contracts FID

No

70.00% 30.00%

Not Relevant (no CBCA decision)

01/2016 01/2019

Construction

01/2017

Commissioning

2019

2019

Pipelines and Compressor Stations Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Lučko-Zabok Zabok-Rogatec

700 700

33 36 69

Total

PCI Details

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity

PCI Benefits

General Criteria Fulfilled Specific Criteria Fulfilled

Yes

Competition, Market Integration, Security of Supply, Sustainability

The project increases the integration of the Croatian gas market with the European gas market, the current interconnection capacity is limited to 1.5 bcm/y. The pipeline will have the reverse flow, so gas can flow from LNG Krk or IAP to Slovenia and further to Central Europe expected to result in reduced end-user energy prices providing the security of supply increasing the capacity along the route providing enhanced access to Baumgarten and the Italian gas market providing an additional import of gas achievement of benefits of the open gas market This project is expected to contribute to the provision of gas supply to potential customers in the Central Europe countries

Specific Criteria Fulfilled Comments

Time Schedule

Grant Obtention Date Delay Since Last TYNDP Delay Explanation

25/04/2016