Page 284 of 620
NDP and PCI Information
Schedule
Start Date
End Date
Third-Party Access Regime
Part of NDP NDP Number
Pre-Feasibility Feasibility FEED Market Test
Considered TPA Regime Considered Tariff Regime Applied for Exemption
Yes (2017-2026)
Regulated Regulated
1.24, 1.25
09/2014
12/2014
No No
Currently PCI
Exemption Granted
Yes (6.26.1)
06/2015 01/2019
Permitting
10/2015
CBCA Decision Market Survey
Exemption in entry direction Exemption in exit direction
Supply Contracts FID
No
70.00% 30.00%
Not Relevant (no CBCA decision)
01/2016 01/2019
Construction
01/2017
Commissioning
2019
2019
Pipelines and Compressor Stations Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Lučko-Zabok Zabok-Rogatec
700 700
33 36 69
Total
PCI Details
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation prior to the commissioning of the project, Project concerns investment in reverse flow capacity
PCI Benefits
General Criteria Fulfilled Specific Criteria Fulfilled
Yes
Competition, Market Integration, Security of Supply, Sustainability
The project increases the integration of the Croatian gas market with the European gas market, the current interconnection capacity is limited to 1.5 bcm/y. The pipeline will have the reverse flow, so gas can flow from LNG Krk or IAP to Slovenia and further to Central Europe expected to result in reduced end-user energy prices providing the security of supply increasing the capacity along the route providing enhanced access to Baumgarten and the Italian gas market providing an additional import of gas achievement of benefits of the open gas market This project is expected to contribute to the provision of gas supply to potential customers in the Central Europe countries
Specific Criteria Fulfilled Comments
Time Schedule
Grant Obtention Date Delay Since Last TYNDP Delay Explanation
25/04/2016