Interconnection Croatia/Slovenia (Lučko - Zabok - Rogatec)
TRA-F-86 Update Date
Project
Pipeline including CS
FID
Advanced
13/07/2016
New pipeline which will upgrade the existing interconnection Croatia/Slovenia. Along with the existing interconnection Karlovac-Lučko-Zabok- Rogatec, a new gas pipeline system has been planned which would significantly increase the capacity of the interconnection of the Croatian and the Slovenian gas transmission systems in this direction. Considering almost all existing and new supply directions in the surrounding region and the Croatian storage potentials this opens significant transit potentials in both directions. Along this transit route, it is planned to upgrade the capacity to 5 bcm/y.
Description
Regulatory Decisions and similar material conditions
Capacity Increments Variant For Modelling Point
Operator
Year 2019 2019
From Gas System To Gas System Capacity
162.0 GWh/d 162.0 GWh/d
Plinacro Ltd Plinacro Ltd
HR
SI
Rogatec
SI
HR
Sponsors Plinacro
General Information
100%
Promoter Operator
Plinacro Ltd Plinacro Ltd
Host Country
Croatia Planned
Status
Website
Project's URL
Publication Approval Status
Approved
Enabled Projects
Project Code Project Name TRA-N-1057 Compressor stations 2 and 3 at the Croatian gas tranmission system
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM