Compressor station 1 at the Croatian gas transmission system
TRA-F-334 Update Date
Project
Pipeline including CS
FID
Advanced
25/05/2016
Construction of such facilities is necessary due to the opening of the gas market, as well as providing sufficient transmission capacities and natural gas delivery pressure conditions and for development of the gas market in Croatia and the neighbouring countries. Compressor stations will significantly increase efficiency of the Croatian gas transmission system. Compressor stations are integral part of the transmission system, integrated in the system, primarily in a manner to increase the flexibility of managing the existing transmission capacities of the system, and to provide rational increase of transmission capacities according to user needs, that is, the requirements of the market and to satisfy market conditions arising from the application of new legal regulation.
Description
Regulatory Decisions and similar material conditions
Sponsors Plinacro
General Information
100%
Promoter Operator
Plinacro Ltd Plinacro Ltd
Host Country
Croatia Planned
Status
Website
Project's URL
Publication Approval Status
Approved
Enabled Projects
Project Code Project Name TRA-N-066 Interconnection Croatia -Bosnia and Herzegovina (Slobodnica- Bosanski Brod) TRA-N-075 LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac TRA-N-070 Interconnection Croatia/Serbia (Slobdnica-Sotin-Bačko Novo Selo) TRA-F-86 Interconnection Croatia/Slovenia (Lučko - Zabok - Rogatec)
TRA-N-1058 LNG Evacuation Pipeline Kozarac-Slobodnica TRA-N-90 LNG evacuation pipeline Omišalj - Zlobin (Croatia)