ENTSOG GRIP SC 2017-2026 / Annex A - Country Profiles

FGSZ LTD. (Natural Gas Transmission Company Limited by Shares)

Website

www.fgsz.hu

Current Publications

10-year Network Development Plan (voluntary)

Total length of the transmission network (this excludes distribution)

5,782 km

Total compressor power

233 MW

Total transported energy in 2015 (in gas)

147,172 GWh

Ratio of transported energy over demand of the national market (2015)

1.55

Unbundling model

ITO

MAGYAR GÁZ TRANZIT ZRT.

Website

www.gaztranzit.hu

Current Publications

Total length of the transmission network (this excludes distribution)

92 km

Total compressor power

7 MW

Total transported energy in 2015 (in gas)

276 GWh

Ratio of transported energy over demand of the national market (2015)

n. d (commissioning year, test mode)

Unbundling model

OU

12 |

Southern Corridor GRIP 2017–2026 Annex A