ENTSOG GRIP CEE 2014-2023 / Main Report
PROJECT PROMOTER
PROJECT NAME
CODE
COMMISSIONING
South Stream Bulgaria AD (Bulgarian Share- holder Bulgarian Energy Holding EAD)
TRA-N-308
2015
South Stream Bulgaria – Stage I
TRA-N-309
2016
South Stream Bulgaria – Stage II
TRA-N-310
2017
South Stream Bulgaria – Stage III
Tauerngasleitung GmbH
TRA-N-035
2018
Tauerngasleitung Gas Pipeline Project
terranets bw GmbH
TRA-N-228
2015
Nordschwarzwaldleitung
Transgaz
TRA-F-139
2013
Integration of the transit and transmission system – reverse flow Isaccea
TRA-F-142
2013
Reverse flow at Negru Voda
TRA-N-126
2013
Reverse flow on the interconnector Romania - Hungary
TRA-F-029
2013
RO-BG Interconnection
TRA-N-132
2015
AGRI Pipeline - Romanian section (East-West Pipeline)
Table 2: Summary of transmission projects, including compressor stations, submitted for CEE GRIP 2014–2023, listed by project promoter
GAZ-SYSTEM S.A.
LNG-F-246
2014
LNG terminal in Świnoujście
LNG-N-272
2020
Upgrade of the LNG terminal in Świnoujście
Plinacro Ltd
LNG-N-082
2017
LNGRV
Table 3: Summary of LNG projects submitted for CEE GRIP 2014–2023, listed by project promoter
Bulgartransgaz EAD
UGS-N-138
2018
UGS Chiren Expansion
UGS-N-141
2020
Construction of new gas storage facility on the territiry of Bulgaria
GdF Suez Energy Romania
UGS-N-233
2015
Depomures
Hungarian Gas Storage
UGS-N-209
2013
Pusztaederics – Compressor System Reconstruction
UGS-N-234
2016
Zsana UGS – Decrease of the minimum injection capacity
GdF Suez Energy Romania
UGS-N-233
2015
Depomures
PGNiG
UGS-F-202
2014
PMG Husów
UGS-F-220
2014
PMG Wierzchowice
UGS-F-201
2016
PMG Brzeźnica
UGS-F-200
2020
KPMG Mogilno
UGS-F-199
2021
KPMG Kosakowo
UGS-N-219
2023*
PMG Wierzchowice extension
Storengy
UGS-F-317
2014
Peckensen Gas Storage
UGS-N-005
2017
Peckensen Gas Storage
Table 4: Summary of UGS projects submitted for CEE GRIP 2014–2023, listed by project promoter
Open Grid Europe GmbH
PRD-N-301
2016
Project study on the integration of Power to Gas (PtG) facilities into the gas transmission system
Table 5: Summary of power to gas projects submitted for CEE GRIP 2014–2023, listed by project promoter
* Where this date had not been provided or the date was indicated as “beyond” a particular year of the covered period, an assumption was taken that the commissioning would be at the beginning of 2023, that is, the last year of this CEE GRIP.
GRIP Central Eastern Europe 2014–2023 |
19