ENTSOG GRIP CEE 2014-2023 / Main Report

PROJECT PROMOTER

PROJECT NAME

CODE

COMMISSIONING

South Stream Bulgaria AD (Bulgarian Share- holder Bulgarian Energy Holding EAD)

TRA-N-308

2015

South Stream Bulgaria – Stage I

TRA-N-309

2016

South Stream Bulgaria – Stage II

TRA-N-310

2017

South Stream Bulgaria – Stage III

Tauerngasleitung GmbH

TRA-N-035

2018

Tauerngasleitung Gas Pipeline Project

terranets bw GmbH

TRA-N-228

2015

Nordschwarzwaldleitung

Transgaz

TRA-F-139

2013

Integration of the transit and transmission system – reverse flow Isaccea

TRA-F-142

2013

Reverse flow at Negru Voda

TRA-N-126

2013

Reverse flow on the interconnector Romania - Hungary

TRA-F-029

2013

RO-BG Interconnection

TRA-N-132

2015

AGRI Pipeline - Romanian section (East-West Pipeline)

Table 2: Summary of transmission projects, including compressor stations, submitted for CEE GRIP 2014–2023, listed by project promoter

GAZ-SYSTEM S.A.

LNG-F-246

2014

LNG terminal in Świnoujście

LNG-N-272

2020

Upgrade of the LNG terminal in Świnoujście

Plinacro Ltd

LNG-N-082

2017

LNGRV

Table 3: Summary of LNG projects submitted for CEE GRIP 2014–2023, listed by project promoter

Bulgartransgaz EAD

UGS-N-138

2018

UGS Chiren Expansion

UGS-N-141

2020

Construction of new gas storage facility on the territiry of Bulgaria

GdF Suez Energy Romania

UGS-N-233

2015

Depomures

Hungarian Gas Storage

UGS-N-209

2013

Pusztaederics – Compressor System Reconstruction

UGS-N-234

2016

Zsana UGS – Decrease of the minimum injection capacity

GdF Suez Energy Romania

UGS-N-233

2015

Depomures

PGNiG

UGS-F-202

2014

PMG Husów

UGS-F-220

2014

PMG Wierzchowice

UGS-F-201

2016

PMG Brzeźnica

UGS-F-200

2020

KPMG Mogilno

UGS-F-199

2021

KPMG Kosakowo

UGS-N-219

2023*

PMG Wierzchowice extension

Storengy

UGS-F-317

2014

Peckensen Gas Storage

UGS-N-005

2017

Peckensen Gas Storage

Table 4: Summary of UGS projects submitted for CEE GRIP 2014–2023, listed by project promoter

Open Grid Europe GmbH

PRD-N-301

2016

Project study on the integration of Power to Gas (PtG) facilities into the gas transmission system

Table 5: Summary of power to gas projects submitted for CEE GRIP 2014–2023, listed by project promoter

* Where this date had not been provided or the date was indicated as “beyond” a particular year of the covered period, an assumption was taken that the commissioning would be at the beginning of 2023, that is, the last year of this CEE GRIP.

GRIP Central Eastern Europe 2014–2023 |

19

Made with