ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects
GERMANY
PROJECTED CAPACITY INCREASES
Interconnection
Capacity (GWh/d)
From Zone
To Zone
Modelled Direction
DESCRIPTION OF THE PROJECT
Extension of the existing salt cavity gas storage.
EXPECTED BENEFITS
Security of Supply, Market integration (Western and Central Europe), Apart from the benefits listed above, the projects will contribute to increased flexibility of the system which will have a positive impact on both market integration and security of supply. Thanks to its location (on the link between the NGC market area and the Gaspool market area), the project will have a positive expected influence on price convergence and arbitrage opportunities.,
COMMENTS ABOUT THE PROJECT FINANCING
Public financing
Private financing
Multilateral financing
| 96
GRIP Central Eastern Europe 2014–2023 Annex B
Made with FlippingBook