ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects
CZECH REPUBLIC
TRA-N-136
Poland-Czech Republic Interconnection within the North-South Corridor (STORK II)
Non-FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-E Project ?
NET4GAS, s.r.o. NET4GAS, s.r.o.
Project of Common Interest Yes
Interested by PCI ? IGAs
None
from Kedzierzyn to ,Ăƛ; ĂŶĚ W> border), GAZ-SYSTEM S.A. (PL) (100%)
ĨƌŽŵ >ŝƓƛ ƚŽ ,Ăƛ (CZ and PL border), NET4GAS, s.r.o. (CZ) (100%)
Web Link
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime
End of permitting phase
# of Pipelines, nodes, CS Total Pipeline Length (km)
Regulated Regulated
1 +107,00
FID Construction Commissioning Last completed Phase :
Total CS Power (MW) Expected Load Factor
No
No
2019
% Exemption in entry direction % Exemption in exit direction
0%
Planned
0%
| 56
GRIP Central Eastern Europe 2014–2023 Annex B
Made with FlippingBook