ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects
AUSTRIA
TRA-N-021
Bidirectional Austrian-Czech Interconnector (BACI, formerly LBL project)
Non-FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-E Project ?
Project of Common Interest Yes Gas Connect Austria GmbH Gas Connect Austria GmbH
Interested by PCI ? IGAs
None
Pipeline on Austrian territory, GAS CONNECT AUSTRIA GmbH (100%)
Pipeline on Czech territory, NET4GAS, s.r.o (100%)
Web Link
TEN-E Requests
Date of Request
Year Funding Granted
27.02.2012
2013
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime
End of permitting phase
# of Pipelines, nodes, CS Total Pipeline Length (km)
Regulated Regulated
2 +58,00
FID Construction Commissioning Last completed Phase :
Total CS Power (MW) Expected Load Factor
No
+24,00
Not relevant
2019
% Exemption in entry direction % Exemption in exit direction
0%
Planned
0%
| 3
GRIP Central Eastern Europe 2014–2023 Annex B
Made with FlippingBook