ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects
BULGARIA
TRA-N-137
Interconnection Bulgaria - Serbia
Non-FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-E Project ?
Bulgarian Ministry of Economy and energy (MEE) Bulgartransgaz EAD
Not part of TEN-E Yes
Interested by PCI ? IGAs
3
ƵůŐĂƌŝĂŶ ƐĞĐƚŝŽŶ͕ DŝŶŝƐƚƌLJ ŽĨ ĐŽŶŽŵLJ
^ĞƌďŝĂŶ ƐĞĐƚŝŽŶ͕ ^ĞƌďŝũĂŐĂƐ ;ϭϬϬйͿ
ĂŶĚ ŶĞƌŐLJ ŽĨ ƵůŐĂƌŝĂ ;ϭϬϬйͿ
Web Link
ǁǁǁ͘ďƵůŐĂƌƚƌĂŶƐŐĂnj͘ďŐ
WƵďůŝĐ &ŝŶĂŶĐŝŶŐ ;ϵϵ͕ϬϬйͿ
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime
End of permitting phase
# of Pipelines, nodes, CS Total Pipeline Length (km)
Regulated Regulated
2014
2
FID Construction Commissioning Last completed Phase :
2014
+155,00
Total CS Power (MW) Expected Load Factor
No
2015 2015
No
% Exemption in entry direction % Exemption in exit direction
0%
Planned
0%
| 21
GRIP Central Eastern Europe 2014–2023 Annex B