ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects

SLOVENIA

PROJECTED CAPACITY INCREASES

Interconnection

Capacity (GWh/d)

From Zone

To Zone

Modelled Direction

DESCRIPTION OF THE PROJECT

Adjustment to operating parameters of the transmission system of the Italian TSO. Reverse flow.

EXPECTED BENEFITS

Removing bottlenecks of transmission system and increase of its capacities up to the existing capacities of neighbouring transmission system operators (first phase) Ensuring additional capacities for further market development and transits, including reverse flows (second phase),

COMMENTS ABOUT THE PROJECT FINANCING

Public financing

Private financing

Multilateral financing

| 191

GRIP Central Eastern Europe 2014–2023 Annex B

Made with