ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects
SLOVENIA
PROJECTED CAPACITY INCREASES
Interconnection
Capacity (GWh/d)
From Zone
To Zone
Modelled Direction
DESCRIPTION OF THE PROJECT
Adjustment to operating parameters of the transmission system of the Italian TSO. Reverse flow.
EXPECTED BENEFITS
Removing bottlenecks of transmission system and increase of its capacities up to the existing capacities of neighbouring transmission system operators (first phase) Ensuring additional capacities for further market development and transits, including reverse flows (second phase),
COMMENTS ABOUT THE PROJECT FINANCING
Public financing
Private financing
Multilateral financing
| 191
GRIP Central Eastern Europe 2014–2023 Annex B
Made with FlippingBook