ENTSOG GRIP CEE 2014-2023 / Annex B : Infrastructure Projects
ROMANIA
TRA-F-139
Integration of the transit and transmission system - reverse flow Isaccea
FID
Pipeline including CS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-E Project ?
Not part of TEN-E Yes Transgaz SNGN Transgaz S.A.
Interested by PCI ? IGAs
None
Web Link
dƌĂŶƐŐĂnj ;ϭϬϬйͿ
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption ? Exemption granted ? Considered TPA Regime Considered Tariff Regime
End of permitting phase
# of Pipelines, nodes, CS Total Pipeline Length (km)
Regulated Regulated
1
FID Construction Commissioning Last completed Phase :
2010
Total CS Power (MW) Expected Load Factor
No
Not relevant
2013
% Exemption in entry direction % Exemption in exit direction
0%
Permitting
0%
| 170
GRIP Central Eastern Europe 2014–2023 Annex B
Made with FlippingBook