ENTSOG GRIP CEE 2014-2023 / Annex A : Country - TSO Profiles
Poland
56
Kaunas
Š akiai
R U S S I A Kaliningrad
Greifswald
Gdansk
Niechorze
Ś winouj ś cie
Kamminke
Płoty
Szczecin
OPAL
GIPL
P O L A N D
Tietier
214
215
Mallnow
Wloclawek
EuRoPoL
Kon
03
38
102
Gross Köris
101
Wysokoje
Lwòwek
EuRoPoL
Poznan
Rembelszczyzna
216
Guben
Gubin
WARSAW
Lodz
Lasów
Odolanów
Wronów
Jeleniów
39
417 VTP-GAZ-SYSTEM
Wroclaw
au
oraSvatéKate ř iny ndov
Tworze ń
Katowice
Kou ř im
AGUE
O ś wi ę cim
Jaroslaw
STORK II
Rzeszow
Cieszyn
PogórskaWola
Skoczów
44
Drozdwicze
217
STORK
C Z E C H R E P.
Drozdovychi
Kralice
Žilina
VeselínadLužnicí
Poprad
Hostim
D Bojanovice
Existing Gas Infrastructure NUMBER OF TSOs
1
TOTAL LENGTH OF TRANSMISSION NETWORK(S)
10,077 km – transmission network 680 km – Yamal-Europe pipeline (GAZ-SYSTEM S.A. fulfils the function of ISO)
TOTAL COMPRESSOR POWER 140.6 MW – transmission network 400 MW – Yamal-Europe pipeline Inter-TSO connections where capacity is marketed (incl. upstream operators) GAZ-SYSTEM S.A. – Lasów / Ontras (DE) – Cieszyn / NET4GAS (CZ) – Drozdowicze / Ukrtransgaz (UA)
– Wysokoje / Gazprom Bieltransgaz (BY) – Tietierówka / Gazprom Bieltransgaz (BY) – Kondratki / Gazprom Bieltransgaz (BY) – Mallnow / Gascade (DE) – Lwówek / GAZ-SYSTEM S.A. - ISO – Włocławek / GAZ-SYSTEM S.A. - ISO
LNG terminals
N / A
Storage facilities GAZ-SYSTEM S.A.
– Swarzów / PGNiG – Strachocina / PGNiG – Brze ō nica / PGNiG – Husów / PGNiG – Wierzchowice / PGNiG – Mogilno / PGNiG
– Daszewo (Low-Methane Gas) / PGNiG – Bonikowo (Low-Methane Gas) / PGNiG – Mikstat / DPV Service Sp. z o.o.
18 | GRIP Central Eastern Europe 2014–2023 Annex A
Made with FlippingBook