ENTSOG GRIP BEMIP 2014-2023 / Main Report

F I N L A N D

Imatra

9.18 mcm/d

90

Hameenlinna

Lappeenranta Kouvola

7.80

Lahti

Mantsala

Vyborg

Turku

Porvoo

Kotka

Lohja

Vousaari

Primorsk Baltic LNG

HELSINKI

Espoo

1.38

Finngulf

G u l f o f F i n l a n d

Hanko

St. Petersburg

7.74

73.0/50.0 bar

0

27.0 bar

Narva

6.36

TALLINN

1.43 mcm/d

BALTICCONNECTOR

27.3 bar

Paldiski

E S T O N I A

1.12

30.0/41.5 bar

6.05

Novgorod

Pärnu

Karksi

Pskov

55

102

Värska

43.7 bar

G u l f o f R i g a

Misso

10.22

Izborsk

N O RD STREAM

91

Korneti

42.0 bar

3.15 mcm/d

R U S S I A

33.4 bar

18.0

Inčukalns UGS

RĪGA lecava

L AT V I A

Rēzekne

Liepāja

34.9 bar

56

Kieménai

6.0

Daugavpils

3.85

Śiauliai

4.25 mcm/d

Klaipeda

Klaipeda

Visaginas

L I T H U A N I A

Jurbarkas

1.75 mcm/d

Kaunas

Jauniunai

57

Šakiai

Kotlovka

YA M A L

92

1.75

Kaliningrad

VILNIUS

3.99

4.16

MINSK

B E L A R U S

GI P L

P O L A N D

Tietierowka

93

Figure 3.7: Gas flows for gas injection into Inčukalns UGS in summer, 2020 (Legend see page 50)

In addition, the case of gas injection into Inčukalns UGS in summer of 2020 is also assessed.

Baltic Energy Market Interconnection Plan GRIP 2014–2023 | 57