ENTSOG GRIP BEMIP 2014-2023 / Main Report
There are 6 UGS facilities connected to the transmission system in Poland. Their total working capacity amounts to 19TWh. The majority of UGS facilities are located in depleted reservoirs, while one is located in a salt cavern. Storage capacity is expected to increase up to more than 33TWh in 2015.
Šakiai
56
Kaunas
Kaliningrad
UGS Kosakowo
Greifswald
Gdansk
Niechorze
Świnoujście
Kamminke
Płoty
P O L A N D
Szczecin OPAL
Tietierowka
214
Gross Köris
GIPL
UGS Mogilno
215
Mallnow
Włocławek
EuRoPoL
Kondratki
103
38
102
101
Wysokoje
Lwòwek
EuRoPoL
216
Rembelszczyzna
Poznań
Kobryn
Guben
WARSAW
Gubin
Łódź
Odolanów
Jeleniów
Wronów
Lasów
39
417
UGS Wierzchowice
Wrocław
VTP-GAZ-SYSTEM
Tworzeń
UGS Brze z nica
Kouřim
Katowice
UGS Swarzów
Oświęcim
PRAGUE
Jarosław UGS Husów
Rzeszow
Cieszyn
Skoczów Pogórska Wola
44
Drozdwicze
217
Lviv
UGS Strachocina
Drozdovychi
Kralice
Žilina
Poprad
Veselí nad Lužnicí
Hostim
Figure 2.21: Location of UGSs, Poland Existing Under construction
38 |
Baltic Energy Market Interconnection Plan GRIP 2014–2023
Made with FlippingBook