ENTSOG GRIP BEMIP 2014-2023 / Annex: Infrastructure Projects
PROJECTED CAPACITY INCREASES
Interconnection
Capacity (GWh/d)
From Zone
To Zone
Modelled Direction
UGS - LV - Latvijas Gaze
Yes
exit
51.75
Hub Latvia
Storage Latvia
DESCRIPTION OF THE PROJECT
Modernization of existing and construction of new facilities with the aim to increase daily output from 30 to 35 mcm and to comply with the EN 1918:1 EXPECTED BENEFITS
Security of supply, market integration, diversification of sources, diversification of routes, N-1 regional (BEMIP), back-up for renewables; the implementation of thepProject will enhance cross-border interconnection capacity, along with strengthening economic cooperation in the region, building links between Poland and Lithuania, and strengthening the economic cohesion with the common EU grid.
COMMENTS ABOUT THE PROJECT FINANCING
Public financing
Private financing
Multilateral financing
Union financial assistance
AS Latvijas Gaze
Other parties keeping gas in the storage
Baltic Energy Market Interconnection Plan GRIP 2014–2023 Annex | 71
Made with FlippingBook