ENTSOG First Report on Implementation Monitoring and Baseline for Effect Monitoring of the Tariff Network Code

TSO/NRA WEBSITE

European TSOs covered in the implementation monitoring part of the report

Link to the Article 29 and 30 information published on the TSO/NRA website

Luxembourg

Creos Luxembourg S.A. (derogation)

BBL Company V.O.F.

TSO website

the Netherlands

Gasunie Transport Services B.V.

NRA website

GAZ-SYSTEM S.A.

TSO website

Poland

GAZ-SYSTEM ISO (EuRoPol GAS S.A)

TSO website

Portugal

REN – Gasodutos, S.A.

NRA website

Romania

Transgaz SA

TSO website

Slovakia

eustream a.s.

TSO website

Slovenia

Plinovodi d.o.o.

TSO website

Enagás S.A

TSO website

Spain

Regasificadora del Noroeste S.A

Sweden

Swedegas AB

TSO website

GNI (UK) Limited

TSO website

Interconnector UK Ltd.

TSO website

United Kingdom

National Grid Gas plc

TSO website

Premier Transmission Ltd.

TSO website

ENTSOGs Transparency Platform – Link to Published Information on TSO or NRAs Website

ENTSOGs Transparency Platform has a link for all TSOs to the information published on their website, or their NRAs website, depending who has publication responsibility. This link can be accessed by going into ENTSOGs Transparency Platform using the following link: https://transparency.entsog.eu/ – click ‘Operators’ on the top toolbar – click on the panel for the TSO you are looking for information on – under ‘Links’ click ‘Tariff information page’ – this will bring you directly to the TSOs or NRAs website.

ENTSOGs Transparency Platform – Standardised Table

ENTSOGs Transparency Platform has a standardised table which publishes the information for all TSOs on the reserve prices for standard capacity products for firm capacity and for standard capacity products for interruptible capacity, and the flow-based charge where applied. Data can be accessed per TSO or IP directly from ENTSOGs Transparency Platform using the following link: https://transparency.entsog.eu/#/points/data?points= – click the ‘Tariff Data’ tab, en- ter the relevant TSO or IP name into the search box, and fill in the relevant date range on the right-hand side.

TAR NC Implementation and Effect Monitoring Report 2017 | 73

Made with FlippingBook flipbook maker