ENTSOG First Report on Implementation Monitoring and Baseline for Effect Monitoring of the Tariff Network Code
TSO/NRA WEBSITE
European TSOs covered in the implementation monitoring part of the report
Link to the Article 29 and 30 information published on the TSO/NRA website
Luxembourg
Creos Luxembourg S.A. (derogation)
BBL Company V.O.F.
TSO website
the Netherlands
Gasunie Transport Services B.V.
NRA website
GAZ-SYSTEM S.A.
TSO website
Poland
GAZ-SYSTEM ISO (EuRoPol GAS S.A)
TSO website
Portugal
REN – Gasodutos, S.A.
NRA website
Romania
Transgaz SA
TSO website
Slovakia
eustream a.s.
TSO website
Slovenia
Plinovodi d.o.o.
TSO website
Enagás S.A
TSO website
Spain
Regasificadora del Noroeste S.A
Sweden
Swedegas AB
TSO website
GNI (UK) Limited
TSO website
Interconnector UK Ltd.
TSO website
United Kingdom
National Grid Gas plc
TSO website
Premier Transmission Ltd.
TSO website
ENTSOGs Transparency Platform – Link to Published Information on TSO or NRAs Website
ENTSOGs Transparency Platform has a link for all TSOs to the information published on their website, or their NRAs website, depending who has publication responsibility. This link can be accessed by going into ENTSOGs Transparency Platform using the following link: https://transparency.entsog.eu/ – click ‘Operators’ on the top toolbar – click on the panel for the TSO you are looking for information on – under ‘Links’ click ‘Tariff information page’ – this will bring you directly to the TSOs or NRAs website.
ENTSOGs Transparency Platform – Standardised Table
ENTSOGs Transparency Platform has a standardised table which publishes the information for all TSOs on the reserve prices for standard capacity products for firm capacity and for standard capacity products for interruptible capacity, and the flow-based charge where applied. Data can be accessed per TSO or IP directly from ENTSOGs Transparency Platform using the following link: https://transparency.entsog.eu/#/points/data?points= – click the ‘Tariff Data’ tab, en- ter the relevant TSO or IP name into the search box, and fill in the relevant date range on the right-hand side.
TAR NC Implementation and Effect Monitoring Report 2017 | 73