ENTSOG First Report on Implementation Monitoring and Baseline for Effect Monitoring of the Tariff Network Code
4.2 Information Sources and Data Collection
The data was collected by means of a survey. It consisted in 5 EM indicators to get information on the current situation which will be used as the baseline to assess TARNC effects. Suggestions from ACER have also been taken into consideration for the definition of the EM indicators.
4.3 Description of the 5 EM Indicators
The 5 EM indicators used by ENTSOG that will be used for the effect monitoring of TARNC are as follows: \\ Indicator TAR.1 on the ‘Level and variability of the under-/over-recovery’ for TSOs. \\ Indicator TAR.2 on ‘Tariff changes at CAM and non-CAM points’ 9) . \\ Indicator TAR.3 on ‘Evolution of short-term and long-term bookings’ of TSO capacity at CAM points. \\ Indicator TAR.4 on ‘Publication of information in English’. \\ Indicator TAR.5 on ‘Multipliers for short-term capacity products’ at IPs. The detailed description of each indicator is provided below.
9) CAM points in a MS correspond to IPs and – where relevant – non-IPs (including entry-points-from and exit-points-to third countries) where the NRA decided to apply the CAM NC. Non-CAM points are all other points in the specific MS.
44 |
TAR NC Implementation and Effect Monitoring Report 2017
Made with FlippingBook flipbook maker