ENTSOG First Report on Implementation Monitoring and Baseline for Effect Monitoring of the Tariff Network Code
Overview of the Rule – Publishing the ‘Simulation’ on ENTSOG’s Transparency Platform in the Standardised Table Group A TSOs must publish a simulation of all the costs for flowing 1GWh/d/year for the new tariff period (1 January 2018 – 31 December 2018) on ENTSOG’s Transparency Platform in the standardised table.
Responses
Group A (27 TSOs) For the new tariff period (1 Jan 2018–
2
2
31 Dec 2018), has a simulation of all the costs for flowing 1 GWh/d/year been published on ENTSOG’s Transparency Platform in the standardised table by the TSO?
Yes, 23 (from 10 MSs) NRA responsibility, 2 (from 1 MS) No, 2 (from 2 MSs)
23
Figure 13: Simulation publication on ENTSOGs Transparency Platform in the standardised table, for the new tariff period
Æ 23 TSOs have published a simulation of all the costs for flowing 1GWh/d/year for the new tariff period on ENTSOG’s Transparency Platform in the standardised table. Æ For two TSOs a decision on who is to publish has not been made and is recorded here as ‘NRA responsibility’. Æ Two TSOs have not published this information, both will add/update all their information on the Transparency Platform in 2018.
26 |
TAR NC Implementation and Effect Monitoring Report 2017