ENTSOG First Report on Implementation Monitoring and Baseline for Effect Monitoring of the Tariff Network Code
‘Early Compliance’ – Providing a Link on ENTSOG’s Transparency Platform to the Information on Flow-based Charges As per ‘early compliance’ publication, group B TSOs with a flow-based charge must provide a link on ENTSOG’s Transparency Platform to their own website with the relevant information for the current tariff period.
Responses
Group B (19 TSOs) Where the TSO has a flow-based charge, has the TSO provided a link on ENTSOG's Transparency Platform to all relevant information for the current tariff period?
7
12
Yes, 12 (from 10 MSs) Non-applicable, 7 (from 5 MSs)
Figure 8: Providing the link on ENTSOGs Transparency Platform to the flow-based charge information for the current tariff period, as per ‘early compliance’.
Æ 12 TSOs provided a link on ENTSOG’s Transparency Platform to their flow- based charge information for the current tariff period. Æ For the remaining TSOs this is non-applicable as they do not apply flow-based charges.
TAR NC Implementation and Effect Monitoring Report 2017 | 21