ENTSOG CAM NC Monitoring Report 2016
TABLE 2: SURVEY ON IMPLEMENTATION STATUS BY IP SIDE
Fully Implemented (FI) Number of IP sides
Not Implemented (NI) Number of IP sides
Not Applicable (NA) Number of IP sides
Comments
Article 3(7)
321
7
0
-
15 IP sides NI: only inter- ruptible capacity or reverse flow capacity is offered or the IP is operated by the same TSO on both sides
Article 6(1(a)) Capacity calculation and maximisation
263
21
29+15
Article 6(1(b)) Capacity calculation and maximisation
258
26
29+15
2 IP sides NI: TSO been granted derogation
Article 8(1)
Allocation methodology
319
4
2
2 IP sides NI: TSO been granted derogation
Article 9 Standard capacity products
321
2
5
Article 19(1) Bundled Capacity products & 19(2)
2 IP sides NI: TSO been granted derogation
303
5
20
– 2 IP sides NI: TSO been granted derogation All available firm capacity is bundled – Both IP sides are operated by one TSO – Bundling of capacity is not possible because the adja- cent TSO has already sold all firm capacity on a long- term basis – Only interruptible capacity is offered
Article 19(5) Bundled Capacity products
264
5
39+20
Article 21(1) Allocation of interruptible services & 21(3)
328
4 NI: no information was delivered 1 NA: TSO been granted exemption
Article 26(2) Tariffs
323
4
1
In this year’s evaluation an improvement regarding the implementation status is recognised in comparison with the monitoring of the implementation results from year 2015.
ENTSOG CAM NC Monitoring Report 2016 |
7
Made with FlippingBook