ENTSOG BAL NC Monitoring Report 2016
Table 3.6: Overview of IPs with coexistence of hourly and daily regimes and other points and IPs where (re-)nomination rules apply
Did the NRA determine that the nomination and re-nomination procedure is required at points other than IPs according to art. 18 and do the principles apply according to art. 18.2? (Please indicate these other points e. g. storage points, LNG points, end consumer points.)
Indication of IPs where hourly and daily nomination regimes co-exist at the two sides of one (or more) IP(s) of your balancing zone (art. 16)?
Country
IP Arnoldstein (AT)/Tarvisio (IT) IP Baumgarten (SK/AT)
AT
Storage, production, biogas and end consumers
Alveringem (BE/FR), Blaregnies (BE)/Blaregnies Troll (FR) (Blaregnies Segeo)
BE/LU 1)
–
BG
–
end-consumer point, distribution networks
Waidhaus (CZ/DE), Brandov Opal (CZ/DE), Brandov Stegal Hora sv. Kateřiny – Olbernhau (CZ/DE), Hora sv. Kateřiny (CZ/DE), Český Těšín (CZ/ PL)
CZ
virtual storage points, directly connected customers
DE
Obergailbach (FR)/Medelsheim (DE)
Storages
The provisions relating to nomination processes apply to all connection points with the transmission network
ES
–
GRTgaz – Taisnières FR/BE), Obergailbach (FR/DE), Jura (FR/CH), Oltingue (FR/CH) TIGF – No
FR
–
HR
Rogatec (HR/SI), Drávaszerdahely (HR/HU)
All entry and exit points
HU
–
–
IE
–
Storage Points and Domestic Entry and Exit Points
Non-EU entry/exit points (Gela, Mazara del Vallo, Passo Gries, Bizzarone, San Marino), LNG entry, storage entry/exit, indigenous production (natural gas and biomethane) entry, delivery to other transmission networks, redelivery points (distribution, final customers)
IT
Tarvisio (IT)/Arnoldstein (AT)
LT
–
LNG point, domestic exit point.
BBL 2) : Bacton (BBL)/Bacton (IUK) GTS – No
NL
GTS – All network points except the ones to DSO-networks.
H-gas: The nominations are required regarding storage points, LNG point, end consumers points, production facilities. L-gas: The nominations are required regarding end consumers points. TGPS: n/a Nominations are required for all network connection points with storage facilities, LNG Terminal facilities and CCGTs end consumers. The entry points in the NTS from the production fields, from the underground storages; Exit points from the NTS towards the end consumers, towards the distribution systems and towards the underground storages.
PL
PL H-gas: Cieszyn (PL)/ Český Těšín (CZ)
PT
–
RO
–
SE
–
–
SK
IP Baumgarten (SK/AT)
–
SI
Aggregated end consumer points
IP Gorizia (IT)/Šempeter (SI) 3)
UK-GB
Bacton (IUK)/Bacton (BBL)
–
1) In Belgium and Luxembourg the stakeholders have been consulted regarding harmonisation: Stakeholders are aware of the situation and did not raise any problem. Contracts were not adapted. 2) In the Netherlands the stakeholders have been consulted regarding harmonisation: https://www.bblcompany.com/about-bbl/consultations-implementation-information/$1125/$1126 . 3) In Slovenia, TSO collects all nominations on hourly bases. In the matching process, TSO aggregates hourly nominations of network users to daily values in order to meet the agreed format for data exchange with adjacent TSO. Since TSO is capable to exchange data with adjacent TSO both on hourly or daily level, the interconnection point was declared as a point where hourly and daily regime for nominations co-exist.
62 |
ENTSOG BAL NC Monitoring Report 2016
Made with FlippingBook