ENTSOG BAL NC Monitoring Report 2016
Table 1.3: Overview of the provided publication links per country
BG
EL
ES
CZ
FR
AT
DE
HR
BE/LU
DK
Updated Interim measures Report approved
Gaspool, NCG
n/a
n/a
n/a
n/a
n/a
n/a
n/a
_ 1)
_ 2)
INTERIM MEASURES
Interim imbalance charge
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
BG
EL
Linepack flexibility service documents
GRTgaz/ TIGF
LINEPACK FLEXIBILITY
n/a
_
n/a
n/a
n/a
n/a
n/a
n/a
n/a
NU’s inputs and off-takes for gas day (art. 32.3)
GRTgaz TIGF*
ES*
CZ
AT*
DE*
HR
BE/LU
DK
_
EL
GRTgaz TIGF
NCG Gaspool
INFORMATION PROVISIONS
TSO balancing actions (art. 32.2)
ES
CZ
AT
HR
BE/LU
DK
_
EL
Overall status of transmission system (art. 32.1)
GRTgaz TIGF
NCG Ga- spool
ES
CZ
AT
HR
BE/LU
DK
BG
EL
Monthly aggregated neutrality charges for balancing (art. 29.4)
GRTgaz, TIGF
Gaspool, NCG
_
ES 3)
_
_
BE/LU
n/a
_
_
PROVIDED LINKS REGARDING NEUTRALITY PUBLICATION
Approved methodology – calculation of neutrality charges (art. 30.2).
_
ES
_
FR
DE
_
BE/LU
n/a
BG
EL
WDO recommendation document (art. 26.6)
Gaspool, NCG
n/a
n/a
AT
n/a
n/a
BE/LU
n/a
_
n/a
PROVIDED LINKS REGARDING WDOS PUBLICATION
Public consultation on WDOs (art. 26.4).
link1 link2
n/a
n/a
_
n/a
n/a
BE/LU
n/a
BG
n/a
PROVIDED LINKS REGARDING DAILY IMBALANCE CHARGE
Daily imbalance charge calculation methodology
GRTgaz, TIGF
Gaspool NCG
CZ
ES
AT
HR
BE/LU
DK
n/a
n/a
Gaspool: link1/ ink2/ link3/ link4 NCG
Balancing services: call for tenders and results
CZ
n/a
n/a
n/a
HR/HR
n/a
n/a
_
EL
PROVIDED LINKS REGARDING OPERATIONAL BALANCING PUBLICATION
Marginal buy/sell price (in Engl.) (art. 10.5)
GRTgaz TIGF
Gaspool NCG
CZ
ES
AT
HR
BE/LU
DK
_
EL
(Annual) costs, frequency, quantities of balancing actions (art. 9.4)
GRTgaz; TIGF
CZ
ES
AT
DE
HR
BE/LU
DK
_
EL
* Information is considered confidential and is provided via secured platform. ** UK-GB do not publish this information but provide the details to each shipper on a monthly basis via their neutrality statements. *** UK-NI published the information on shipper invoice backing data. 1) Bulgartransgaz shall update and submit the annual report to the NRA after 6 months of implementation of the new Balancing regime. 2) DESFA’s current consideration is that submission of an updated version of the report on Interim Measures is not necessary, since: a) Most of the measures included in the report (e.g. reduction of tolerance levels, revision of resale scheme, full re-nomination cycles) have already been incorporated in DESFA’s proposal for the 3 rd revision of the Network Code; b) The rest of the proposed measures are expected to be implemented according to schedule. 3) In Spain, the information is provided through the IT system SL-ATR (Logistics System for Third Party Network Access).
46 |
ENTSOG BAL NC Monitoring Report 2016
Made with FlippingBook