ENTSOG Annual Report 2016

GAS REGIONAL INVESTMENT PLANS MAP

GRIP NORTH-WEST

GRIP BEMIP

GRIP SOUTH

GRIP SOUTH-NORTH CORRIDOR

GRIP CENTRAL EASTERN EUROPE

GRIP SOUTHERN CORRIDOR

SUPPORTING GAS REGIONAL INVESTMENT PLANS

Establishment of Gas Regional Investment Plans (GRIPs) is a require- ment under Art 12(1) of Regulation (EC) 715/2009. These GRIPs are developed by member TSOs under the umbrella of ENTSOG. These plans help to coordinate activities between neighbouring TSOs and provide support for further infrastructure development wherever nec- essary. GRIPs serve as a link between TYNDP and national plans. In 2015, member TSOs determined that the third editions of GRIP re- ports would be developed jointly with TYNDP 2017. This ensures the use of a common dataset for GRIPs and TYNDP and complementarity be- tween the reports. For the GRIPs to be published in spring and summer 2017, ENTSOG handled a joint TYNDP and GRIPs data collection, centralisation of data processing and modelling of the European gas system during 2016.

30 |

ENTSOG Annual Report 2016

Made with