ENTSOG Annual Report 2016

DELIVERABLE &  COMPLETION DATE

ACTIVITY

GOAL

STATUS / COMMENTS

CONSULTATION WITH

SYSTEM DEVELOPMENT AREA

Summer Outlook 2016

Provide view on injection period ahead Publication on 20 April 2016

ACER

Completed

Summer Review 2015

Analyse previous summer

Publication on 20 April 2016

Completed

Transmission Capacity Map 2016

Provide overview of annual capacity at IP level

Publication on 10 June 2016

Completed

System Development Map 2015/2016

Provide project map and graphic representation of supply-and-demand for past year

Publication on 15 September 2016

Completed

Winter Outlook 2016/17

Provide view on supply-and-demand balance for winter ahead

Publication on 14 October 2016 ACER

Completed

Winter Review 2015/16

Analyse previous winter

Publication on 14 October 2016

Completed

TYNDP 2017

Assess the infrastructure against the European Energy Policies to identify infrastructure gaps and mitigation of these gaps by projects on the basis of the CBA Methodology in force

Final TYNDP publication by end April 2017

Stakeholders, ACER

Draft version published on 20 December 2016 Preliminary results publi- cation in October 2016 Input data publication in July 2016 Completed The ENTSOs may adapt the model in 2017 based on ACER and Commission opinions Ongoing task Public consultation and workshops on story lines in May-June-July 2016

ENTSO-E/ENTSOG consistent and interlinked model

Submit the ENTSOs model in line Art 11(8) of Regulation (EU) 347/2013

Submission to ACER and Commission for their opinion on 21 December 2016

ACER, Commission

TYNDP 2018 scenario development process

Joint scenario development process between both ENTSOs

Scenario Report to be published for public consultation mid-2017

Stakeholders, NRAs, Member States, ACER, Commission

Support to TSOs for GRIPs

3 rd edition of GRIPs to be delivered in 2017

Ongoing task

Support in modelling

Support to Regional Groups

Contribution to the EC/ACER/ ENTSOs Cooperation Platform (ongoing) Operationalisation of the PCI call using ENTSOG Project portal (completed)

Provide technical expertise during the third selection process.

Ongoing task

Support promoters on CBA at project level by handling modelling and provid- ing templates.

Support to promoters (ongoing)

Support to GCG

Analysis of gas demand

Prepare framework for demand scenarios

Four demand scenarios devel- oped for TYNDP 2017, making use of ENTSO-E TYNDP 2016 scenarios Three demand scenarios under joint development by both ENTSOs for TYNDP 2018

Stakeholders, NRAs, Member States, ACER, Commission

Completed for TYNDP 2017 Ongoing for TYNDP 2018

Analysis of supply flexibility

Prepare framework for supply poten- tials, for TYNDP and Seasonal Outlooks

Definition of supply potentials

Stakeholders, suppliers

Completed for TYNDP 2017 and Seasonal Outlooks

Investigation of transmission infrastructure role in supporting sustainability

Assess ability of gas infrastructure to support renewables

Analysis and assessment performed as part of TYNDP 2017 Improvement of the modelling for TYNDP 2017 and informa- tion of stakeholders

Completed

ENTSOG modelling tool

Ensure adequacy of the modelling tool with the assessment methodologies put in place by ENTSOG Develop an updated and improved CBA methodology in line with Art 11(6) or Regulation 347

Completed for TYNDP 2017

Update of CBA Methodology

Task initiated end 2016