ENTSOG Annual Report 2016
DELIVERABLE & COMPLETION DATE
ACTIVITY
GOAL
STATUS / COMMENTS
CONSULTATION WITH
SYSTEM DEVELOPMENT AREA
Summer Outlook 2016
Provide view on injection period ahead Publication on 20 April 2016
ACER
Completed
Summer Review 2015
Analyse previous summer
Publication on 20 April 2016
Completed
Transmission Capacity Map 2016
Provide overview of annual capacity at IP level
Publication on 10 June 2016
Completed
System Development Map 2015/2016
Provide project map and graphic representation of supply-and-demand for past year
Publication on 15 September 2016
Completed
Winter Outlook 2016/17
Provide view on supply-and-demand balance for winter ahead
Publication on 14 October 2016 ACER
Completed
Winter Review 2015/16
Analyse previous winter
Publication on 14 October 2016
Completed
TYNDP 2017
Assess the infrastructure against the European Energy Policies to identify infrastructure gaps and mitigation of these gaps by projects on the basis of the CBA Methodology in force
Final TYNDP publication by end April 2017
Stakeholders, ACER
Draft version published on 20 December 2016 Preliminary results publi- cation in October 2016 Input data publication in July 2016 Completed The ENTSOs may adapt the model in 2017 based on ACER and Commission opinions Ongoing task Public consultation and workshops on story lines in May-June-July 2016
ENTSO-E/ENTSOG consistent and interlinked model
Submit the ENTSOs model in line Art 11(8) of Regulation (EU) 347/2013
Submission to ACER and Commission for their opinion on 21 December 2016
ACER, Commission
TYNDP 2018 scenario development process
Joint scenario development process between both ENTSOs
Scenario Report to be published for public consultation mid-2017
Stakeholders, NRAs, Member States, ACER, Commission
Support to TSOs for GRIPs
3 rd edition of GRIPs to be delivered in 2017
Ongoing task
Support in modelling
Support to Regional Groups
Contribution to the EC/ACER/ ENTSOs Cooperation Platform (ongoing) Operationalisation of the PCI call using ENTSOG Project portal (completed)
Provide technical expertise during the third selection process.
Ongoing task
Support promoters on CBA at project level by handling modelling and provid- ing templates.
Support to promoters (ongoing)
Support to GCG
Analysis of gas demand
Prepare framework for demand scenarios
Four demand scenarios devel- oped for TYNDP 2017, making use of ENTSO-E TYNDP 2016 scenarios Three demand scenarios under joint development by both ENTSOs for TYNDP 2018
Stakeholders, NRAs, Member States, ACER, Commission
Completed for TYNDP 2017 Ongoing for TYNDP 2018
Analysis of supply flexibility
Prepare framework for supply poten- tials, for TYNDP and Seasonal Outlooks
Definition of supply potentials
Stakeholders, suppliers
Completed for TYNDP 2017 and Seasonal Outlooks
Investigation of transmission infrastructure role in supporting sustainability
Assess ability of gas infrastructure to support renewables
Analysis and assessment performed as part of TYNDP 2017 Improvement of the modelling for TYNDP 2017 and informa- tion of stakeholders
Completed
ENTSOG modelling tool
Ensure adequacy of the modelling tool with the assessment methodologies put in place by ENTSOG Develop an updated and improved CBA methodology in line with Art 11(6) or Regulation 347
Completed for TYNDP 2017
Update of CBA Methodology
Task initiated end 2016
ENTSOG Annual Report 2016 |
19
Made with FlippingBook