ENTSOG Annual Report 2014

Implementation and Monitoring of New Regulations

The following sections describe how the network codes and guidelines are implemented and monitored in addition to the implementation of additional relevant EU Regulations.

MONITORING THE CMP NETWORK CODE

As stipulated by article 8 (8) of the Gas Regula- tion, ENTSOG monitors the implementation of the Congestion Management Procedures (CMP). CMP was developed by the European Commission from 2010–2011, approved by the EU Gas Committee on 24 August 2012, and im- plemented on 1 October 2013.

ENTSOG launched the monitoring process in November 2014 to ensure the timely publication of results in Annual Report 2014. Since ACER’s detailed CMP implementation monitoring report was already published in January 2015, ENTSOG chose a less complex method of self- assessment for Transmission System Operators (TSOs). The aggregated results are shown below.

Overview of Implementation status

OVERSUBSCRIPTION AND BUY-BACK SCHEME OR FIRM DAY-AHEAD UIOLI MECHANISM  1)

NUMBER OF TSOs

ADDITIONAL CAPACITY BY CMP MEASURES

SURRENDER OF CONTRACTED CAPACITY

LONG-TERM UIOLI

COMMENTS

Including exemption as per NRA decision under point 2.2.3(6)  1)

29

LT UIOLI: delayed implemen­ tation in accordance with NRA

1

OS+BB: The NRA has not ap- proved the proposed scheme yet

1

3

OS+BB: implementation in 2015

OS+BB + SoC: implementation in 2015 OS+BB + LT UIOLI: implementation in 2015 OS+BB + SoC + LT UIOLI: implementation in 2015

1

1

3

8

Implemented   In process of implementation (NRA decision pending)   Not applicable, as regards scope, implementation date or derogation under Article 49 of Gas Directive  

Not implemented

1) The firm day-ahead UIOLI mechanism should be implemented by 1 July 2016, where ACER’s congestion monitoring report shows that there is excessive demand for firm capacity products offered in the next three years or where no firm capacity is offered at all

ENTSOG Annual Report 2014 |

43