ENTSOG Annual Report 2014
DELIVERABLE & COMPLETION DATE
ACTIVITY
GOAL
STATUS / COMMENTS
CONSULTATION WITH
SYSTEM DEVELOPMENT
COST BENEFIT ANALYSIS METHODOLOGY
Publish an adapted methodology based on ACER and EC opinion Provide a view on injection period in the context of the Ukraine crisis Analyse the supply and demand trends of previous summer Provide a view on the supply/demand balance on the winter ahead Analyse the supply and demand trends of previous winter
Publication on 18 August for EC final opinion
ACER, EC, Stakeholders
EC provided its final approval on 4 February 2015
SUMMER SUPPLY OUTLOOK 2014
Publication on 23 April
Gas Coordination Group
Completed
SUMMER 2013 REVIEW
Publication on 23 April
Completed
WINTER SUPPLY OUTLOOK 2014 -15
Publication on 3 November
Gas Coordination Group
Completed
WINTER 2013-14 REVIEW
Publication on 3 November
Completed
TRANSMISSION CAPACITY MAP 2014
Provide an overview of annual capacity at IP level
Publication on 12 June
Completed
SYSTEM DEVELOPMENT MAP 2013
Publication on 12 November
Completed
Provide a graphical representa- tion of supply and demand for the past year Make available TSO expertise in the area of security of supply
SUPPORT TO GAS COORDINATION GROUP
Modelling of Stress Tests sent to European Commission on 24 September
EC, Member States, ACER and main associations
Continuous task Completed for Stress Test
SUPPORT TO REGIONAL GROUPS
Bring technical expertise during the second PCI selection
Non-applicable
Support to Regional Groups – Completed for 2nd GRIP edition
SUPPORT TO TSOs FOR GRIPS
Completed
Support in the modelling and layout of reports
Last GRIP (2nd edition) published in August 2014
ANALYSIS OF GAS DEMAND
Two demand scenarios included in TYNDP 2015
ACER, EC, Stakeholders
Continuous task Completed for TYNDP 2015 Continuous task Completed for TYNDP 2015
Prepare framework for demand scenarios
ANALYSIS OF SUPPLY FLEXIBILITY
Prepare framework for supply scenarios
Definition of range of supply for each source for TYNDP 2015 and Supply Outlooks
ACER, EC, Stakeholders
INVESTIGATION OF TRANSMISSION INFRASTRUCTURE ROLE IN SUPPORTING SUSTAINABILITY
Continuous task
Assess the ability of gas infrastructure to support RES development
ENTSOG MODELLING TOOL
Ensure the adequacy of the modelling tool with the assess- ment methodologies put in place by ENTSOG Ensure ENTSOG ability to efficiently collect and process data for deliverables and Transparency Platform
Temporal modelling
Continuous task Completed for TYNDP 2015 and Supply Outlooks of 2014
EC, ACER and stakeholders
Power generation modelling
DATA WAREHOUSE PROJECT
Under progressive commission- ing between July and December
EC, ACER and stakeholders (for Transparency Platform part)
Completed before new evolutions