ENTSOG Annual Report 2013
GROUP STRUCTURE
SYSTEM DEVELOPMENT BUSINESS AREA
All activities of the System Development Business Area are managed by the Investment Working Group.
General Manager
The Investment Working Group is supported in its mission by four Kernel Groups (KGs), each of which focusses on specific areas: \\ Network Modelling Kernel Group (NeMo KG): development and enhancement of ENTSOG’s Network Modelling tool and performance of simulations \\ Supply&Demand Kernel Group (S&D KG): development of supply and demand ap- proach for ENTSOG deliverables based on analysis of current situation and alternative scenarios. Particular focus is given to gas demand for power generation. \\ Energy Infrastructure Priorities Kernel Group (EIP KG): analysis and development of recommenda- tions for the Connecting Europe Package and drafting of CBA methodology \\ Editing: proofing TYNDP and checking terminologi- cal and stylistic consistency between reports As part of ENTSOG’s R&D Plan, S&D KG held an internal expert workshop in autumn 2013 to integrate experience gained by TSOs on gas de- mand for power generation. ENTSO-E attended the event to improve the consistency between scenario and approach development.
System Development
Investment WG
INVESTMENT WG STRUCTURE
System Development
Investment WG
Energy Infrastructure Priorities KG
Network Modelling KG
Supply & Demand KG
Editing KG
ENTSOG Annual Report 2013 |
29
Made with FlippingBook