Baltic Energy Market Interconnection Plan GRIP 2017
LESS-ADVANCED NON-FID PROJECTS
ADVANCED NON-FID PROJECTS
2nd PCI LIST NON-FID PROJECTS
ADVANCED NON-FID PROJECTS
Minimum development of infrastructure common to all levels
FID PROJECTS
FID PROJECTS
FID PROJECTS
FID PROJECTS
EXISTING INFRASTRUCTURE
EXISTING INFRASTRUCTURE
EXISTING INFRASTRUCTURE
EXISTING INFRASTRUCTURE
ADVANCED
2nd PCI LIST
HIGH
LOW
Assessment as a whole of the projects belonging to each Infrastructure Level
Assessment of the Infrastructure needs
Figure 5.1: Infrastructure Levels (Source: TYNDP 2017)
Image courtesy of Gascade
96 |
BEMIP Gas Regional Investment Plan 2017