Baltic Energy Market Interconnection Plan GRIP 2017

LESS-ADVANCED NON-FID PROJECTS

ADVANCED NON-FID PROJECTS

2nd PCI LIST NON-FID PROJECTS

ADVANCED NON-FID PROJECTS

Minimum development of infrastructure common to all levels

FID PROJECTS

FID PROJECTS

FID PROJECTS

FID PROJECTS

EXISTING INFRASTRUCTURE

EXISTING INFRASTRUCTURE

EXISTING INFRASTRUCTURE

EXISTING INFRASTRUCTURE

ADVANCED

2nd PCI LIST

HIGH

LOW

Assessment as a whole of the projects belonging to each Infrastructure Level

Assessment of the Infrastructure needs

Figure 5.1: Infrastructure Levels (Source: TYNDP 2017)

Image courtesy of Gascade

96 |

BEMIP Gas Regional Investment Plan 2017 

Made with