Baltic Energy Market Interconnection Plan GRIP 2017

TRANSPORT BY PIPELINES PROJECTS

Project ENTSOG code

PCI status

Project name

Project promoter

Project status

DENMARK

• TRA-N-428 (Mirror) Baltic Pipe

Energinet.dk

Non-FID

PCI

• TRA-N-394 Gassled – Danish upstream system

Energinet.dk

Non-FID

Non-PCI

Energinet.dk

Non-FID

Non-PCI

TRA-N-780 Nybro-Interconnector PL–DK – reinforcement

ESTONIA

TRA-N-895 Balticconnector

Elering AS

Advanced

PCI

Elering AS

Advanced

PCI

TRA-N-915 Enhancement of Estonia–Latvia interconnection

FINLAND

TRA-N-928 Balticconnector Finnish part

Baltic Connector Oy

Advanced

PCI

LATVIA

TRA-N-382 Enhancement of Latvia-Lithuania interconnection (Latvian part)

JSC Conexus Baltic Grid

Non-FID

PCI

LITHUANIA

TRA-N-341 Gas Interconnection Poland–Lithuania (GIPL) (Lithuania’s section)

AB Amber Grid

Advanced

PCI

Non-FID

PCI

TRA-N-342 Enhancement of Latvia–Lithuania interconnection (Lithuania’s part) AB Amber Grid

POLAND

TRA-N-212 Gas Interconnection Poland-Lithuania (GIPL) PL section

GAZ-SYSTEM S.A.

Advanced

PCI

TRA-N-247 North-South Gas Corridor in Western Poland

GAZ-SYSTEM S.A.

Advanced

PCI

GAZ-SYSTEM S.A.

Advanced

PCI

TRA-N-273 Poland–Czech Republic interconnection (PL section)

TRA-N-275 Poland-Slovakia interconnection (PL section)

GAZ-SYSTEM S.A.

Advanced

PCI

TRA-N-245 North-South Gas Corridor in Eastern Poland

GAZ-SYSTEM S.A.

Non-FID

PCI

TRA-N-271 Poland-Denmark interconnection (Baltic Pipe) PL section

GAZ-SYSTEM S.A.

Non-FID

PCI

TRA-N-621 Poland-Ukraine Interconnector (PL section)

GAZ-SYSTEM S.A.

Non-FID

Non-PCI

•  Project not marked on the map

Table 4.1: List of pipeline projects planned in the BEMIP region

72 |

BEMIP Gas Regional Investment Plan 2017 