Baltic Energy Market Interconnection Plan GRIP 2017
TRANSPORT BY PIPELINES PROJECTS
Project ENTSOG code
PCI status
Project name
Project promoter
Project status
DENMARK
• TRA-N-428 (Mirror) Baltic Pipe
Energinet.dk
Non-FID
PCI
• TRA-N-394 Gassled – Danish upstream system
Energinet.dk
Non-FID
Non-PCI
Energinet.dk
Non-FID
Non-PCI
TRA-N-780 Nybro-Interconnector PL–DK – reinforcement
ESTONIA
TRA-N-895 Balticconnector
Elering AS
Advanced
PCI
Elering AS
Advanced
PCI
TRA-N-915 Enhancement of Estonia–Latvia interconnection
FINLAND
TRA-N-928 Balticconnector Finnish part
Baltic Connector Oy
Advanced
PCI
LATVIA
TRA-N-382 Enhancement of Latvia-Lithuania interconnection (Latvian part)
JSC Conexus Baltic Grid
Non-FID
PCI
LITHUANIA
TRA-N-341 Gas Interconnection Poland–Lithuania (GIPL) (Lithuania’s section)
AB Amber Grid
Advanced
PCI
Non-FID
PCI
TRA-N-342 Enhancement of Latvia–Lithuania interconnection (Lithuania’s part) AB Amber Grid
POLAND
TRA-N-212 Gas Interconnection Poland-Lithuania (GIPL) PL section
GAZ-SYSTEM S.A.
Advanced
PCI
TRA-N-247 North-South Gas Corridor in Western Poland
GAZ-SYSTEM S.A.
Advanced
PCI
GAZ-SYSTEM S.A.
Advanced
PCI
TRA-N-273 Poland–Czech Republic interconnection (PL section)
TRA-N-275 Poland-Slovakia interconnection (PL section)
GAZ-SYSTEM S.A.
Advanced
PCI
TRA-N-245 North-South Gas Corridor in Eastern Poland
GAZ-SYSTEM S.A.
Non-FID
PCI
TRA-N-271 Poland-Denmark interconnection (Baltic Pipe) PL section
GAZ-SYSTEM S.A.
Non-FID
PCI
TRA-N-621 Poland-Ukraine Interconnector (PL section)
GAZ-SYSTEM S.A.
Non-FID
Non-PCI
• Project not marked on the map
Table 4.1: List of pipeline projects planned in the BEMIP region
72 |
BEMIP Gas Regional Investment Plan 2017