Baltic Energy Market Interconnection Plan GRIP 2017

2017

Remaining Flexibility

> 20% 5% – 20% 1% – 5% 0% – 1%

< 20% > 20% Disrupted Rate

Blue scenario, design case, no supply from Russia to the Baltic States and Finland

2025 Low

2020 Low

Low infrastructure scenario + GIPL

Low infrastructure scenario + GIPL

2020 PCI

2025 PCI

Low infrastructure scenario + PCI projects in the Baltic states (EE, EV, LT)

Low infrastructure scenario + PCI projects in the Baltic states (EE, EV, LT)

2020

2025

Low infrastructure scenario + PCI projects in the BEMIP GRIP countries

Low infrastructure scenario + PCI projects in the BEMIP GRIP countries

Figure 5.4: Blue scenario, design case, no supply from Russia to the Baltic States and Finland

BEMIP Gas Regional Investment Plan 2017 |

103