Baltic Energy Market Interconnection Plan GRIP 2017
2017
Remaining Flexibility
> 20% 5% – 20% 1% – 5% 0% – 1%
< 20% > 20% Disrupted Rate
Blue scenario, design case, no supply from Russia to the Baltic States
2025 Low
2020 Low
Low infrastructure scenario + GIPL
Low infrastructure scenario + GIPL
2020 PCI
2025 PCI
Low infrastructure scenario + PCI projects in the Baltic states (EE, EV, LT)
Low infrastructure scenario + PCI projects in the Baltic states (EE, EV, LT)
2020
2025
Low infrastructure scenario + PCI projects in the BEMIP GRIP countries
Low infrastructure scenario + PCI projects in the BEMIP GRIP countries
Figure 5.3: Blue scenario, design case, no supply from Russia to the Baltic States
102 |
BEMIP Gas Regional Investment Plan 2017
Made with FlippingBook